三峡工程对坝下长江流量影响研究
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:

国家"八五"攻关项目85-16-06-03


The Impacts of The Three Gorges Project on its Downflow Discharge of The Changjiang River
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 附件
  • |
  • 文章评论
    摘要:

    根据长江水情的具体特点,采用Preismann隐式格式,建立了一个描述长江水情的水动力学数值模式.以最佳拟会历史水文资料,重演历史水文过程为原则,率定数值模式中的各参数;并运用率定后的模式,进行三峡工程对坝下长江(枯水期和丰水期)若干断面处流量影响的模拟预测.

    Abstract:

    According to the regime of the Changjiang River, this paper sets up a numerical dynamics model of applying Preismann implicit difference method for difference treating of Saint Venant equations. Based on the best-imitating historical hydrologic data and recurring historical hydrologic process, each parameter in the differential equation is rated. The rated model ivS used to study the impacts of the Three Gorges Project on the discharge, in dry and rain seasons respectively, at certain stations along the Changjiang River, The results are as follows. (1) The impacts of the increased/decreased sluicing discharge from the Three Gorges Dam will reduce relatively with the distance of calculating section from Yichang Station after the Three Gorges Project operated. The relative reducing rate is about 0.5 during rain season, and about 0.67 during dry season in Datong section of the river. The reason is that the distance of calculating section from Yichang to Datong is not only longer, but also wider, and the capacity of river regulating is greater. (2) Because of greater roughness of the river basing during dry season(0.036 0 -0.036 5) than that of rain season(0.0260-0.0265), the damping effect of the river section during dry season is stronger than that of rain season, and the the impacts of the Three Gorges Project on discharge along its downflow of the Changjiang River during dry season are greater than that of rain season. The rate of the impact value between rain season and dry season is 1.0-0.75. when the sluicing discharge from the Three Gorges Project increases/decreases relatively after the Three Gorges Project operated.

    参考文献
    相似文献
    引证文献
引用本文

姜加虎,黄群.三峡工程对坝下长江流量影响研究.湖泊科学,1997,9(2):105-111. DOI:10.18307/1997.0202

复制
相关视频

分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:1995-10-19
  • 最后修改日期:1996-06-07
  • 录用日期:
  • 在线发布日期: 2015-03-26
  • 出版日期:
文章二维码
您是第    位访问者
地址:南京市江宁区麒麟街道创展路299号    邮政编码:211135
电话:025-86882041;86882040     传真:025-57714759     Email:jlakes@niglas.ac.cn
Copyright:中国科学院南京地理与湖泊研究所《湖泊科学》 版权所有:All Rights Reserved
技术支持:北京勤云科技发展有限公司

苏公网安备 32010202010073号

     苏ICP备09024011号-2