引用本文:甘富万,黄宇明,张华国,高扬,覃丽娜,肖良.河流支流入汇口处水利工程防洪设计水位研究:以珠江流域西江桂平航运枢纽为例.湖泊科学,2020,32(1):198-206. DOI:10.18307/2020.0119
GAN Fuwan,HUANG Yuming,ZHANG Huaguo,GAO Yang,QIN Lina,XIAO Liang.Design water level for flood control of water conservancy projects at the inlet and confluence of branches in river basins: A case study from Guiping Shipping Hub, Xijiang River, Pearl River Basin. J. Lake Sci.2020,32(1):198-206. DOI:10.18307/2020.0119
【打印本页】   【HTML】   【下载PDF全文】   查看/发表评论  【EndNote】   【RefMan】   【BibTex】
←前一篇|后一篇→ 过刊浏览    高级检索
本文已被:浏览 5629次   下载 2164 本文二维码信息
码上扫一扫!
分享到: 微信 更多
河流支流入汇口处水利工程防洪设计水位研究:以珠江流域西江桂平航运枢纽为例
甘富万1,2, 黄宇明1, 张华国1, 高扬1, 覃丽娜1, 肖良1
1.广西大学土木建筑工程学院, 南宁 530004;2.广西防灾减灾与工程安全重点实验室, 南宁 530004
摘要:
修建在河流支流入汇口处的水利工程,同时受干、支流洪水共同作用,其防洪水位不但与洪水组合特性有关,还与洪水、水利工程行洪的耦合关系有关.已有采用设计洪水重现期对应的特征洪水组合,或者直接采用经验洪水组合进行调洪计算得到防洪设计水位的方法无法有效反映洪水与水利工程的相互作用.本文结合防洪标准的本质,利用Copula-蒙特卡罗模拟方法对修建在支流入汇口处的水利工程的防洪设计水位进行计算,并以珠江流域西江支流郁江广西桂平航运枢纽水闸为例展开研究.结果表明:Copula-蒙特卡罗模拟方法可以有效考虑干、支流洪水组合特性及其与水利工程行洪的耦合关系,以其计算得到的防洪设计水位唯一且可保证达到防洪标准的要求,可有效克服利用洪水重现期确定防洪设计水位存在的不确定性;在干、支流洪水共同作用下,以设计洪水重现期的不同特征组合计算得到的防洪设计水位相差非常大,且与达到防洪标准要求的防洪设计水位相比完全偏离了合理的误差范围,不宜以设计洪水重现期确定防洪设计水位;利用经验洪水组合计算难以合理反映不同工程的洪水及工程特性.研究成果可为修建在支流入汇口处受干、支流洪水共同影响的水利工程防洪设计提供更合理的理论依据和思路.
关键词:  Copula函数  蒙特卡罗模拟方法  防洪水位  重现期  桂平航运枢纽  球江流域
DOI:10.18307/2020.0119
分类号:
基金项目:国家自然科学基金项目(41807197)、广西自然科学基金项目(2018GXNSFAA138042)和广西高校中青年教师基础能力提升项目(2018KY0025)联合资助.
Design water level for flood control of water conservancy projects at the inlet and confluence of branches in river basins: A case study from Guiping Shipping Hub, Xijiang River, Pearl River Basin
GAN Fuwan1,2, HUANG Yuming1, ZHANG Huaguo1, GAO Yang1, QIN Lina1, XIAO Liang1
1.College of Civil Engineering and Architecture, Guangxi University, Nanning 530004, P. R. China;2.Guangxi Key Laboratory of Disaster Prevention and Reduction and Engineering Safety, Nanning 530004, P. R. China
Abstract:
The hydraulic engineering built at the inflow into the junction can be affected by both main and tributary floods. The control flood level has relationship not only with flood combination characteristic, but also with the coupling relation between flood and hydraulic engineering flood discharge. The existing methods of designed flood level assessment, based on the characteristic flood combination corresponding to the design flood recurrence period or the empirical combination directly, cannot accurately reflect the interaction between floods and hydraulic engineering. In this paper, the Copula-Monte Carlo simulation method is used to calculate the flood control design water level of hydraulic engineering built at the inflow into the junction. The acceptability is verified via a case study in the sluice of Guangxi Guiping Shipping Hub, Xijiang River, Pearl River Basin. The results show that, the proposed method can be used to account for the combination characteristic of main and tributary floods and coupling relationship with flood discharge of hydraulic engineering. The calculation result of the designed flood control water level meets the requirement of the flood control standard, indicating that the uncertainty of determining the designed flood control water level by using the flood return period is effectively overcame. Under the combined action of main and tributary floods, the design water level varies tremendously by using the different combinations of characteristic of the design flood recurrence period. The deviation exceeds the reasonable error range of the flood control standard, suggesting the unacceptability of the use of the design flood return period on the determination of flood control level. Otherwise, the results also indicate that it is difficult to reflect the flood and engineering characteristics of different projects reasonably by using empirical flood combination. The paper can provide a more reasonable theoretical basis and ideas for flood control design of the hydraulic engineering affecting by main and tributary floods at the inflow into the junction.
Key words:  Copula function  Monte Carlo simulation method  flood control design water level  recurrence period  Guiping Shipping Hub  Pearl River Basin